Ready-Mix Concrete Calculator

The yards to order — rounded to the step your supplier sells, fees included.

An estimate to order from — your supplier's step, minimum and prices are the ones that count.

Slab 1

10' · 120 in · 10 ft · 3.048 m

10' · 120 in · 10 ft · 3.048 m

4" · 4 in · 0.3333 ft · 0.1016 m

33.333 ft³

10% covers spill, a soft base and forms that bow. It is added once, to the concrete and the base gravel.

This page recalculates as you type. There is no Calculate button.

Answer

Save imageExcel

Ready-mix, in quarter-yard steps

1.5 yd³ of ready-mix

1.358 yd³ with 10% waste · billed for 2 yd³ · or 62 bags (4,960 lb)

Bags 62 × 80 lb bags
Concrete 33.333 ft³
In cubic yards 1.235 yd³
In cubic meters 0.944 m³
With 10% waste 1.358 yd³
Ticked items cost $370.00
DrawingThe project drawn to scale. Slab 1: 10' × 10'.10'10'Slab 1

Breakdown

Part Measurements Qty Volume Share
Slab 1 10' × 10' × 4" Add ×1 33.333 ft³

What to buy

Ways to buy the bags

Every way is worked out; pick the one you will buy. The 50 and 90 lb bags are offered on their own only: we have not seen them on a shelf.

60 × 80 lb + 1 × 60 lb + 1 × 40 lb Bags 62 Left over 0.08 ft³ Weight 4,900 lb Cost $349.76
61 × 80 lb + 1 × 40 lb Bags 62 Left over 0.23 ft³ Weight 4,920 lb Cost $350.46
55 × 90 lb Bags 55 Left over 0.46 ft³ Weight 4,950 lb Cost $356.40 Reference price $6.48. Type your store's.
62 × 80 lb Bags 62 Left over 0.53 ft³ Weight 4,960 lb Cost $352.16 Reference price $5.68. Type your store's.
82 × 60 lb Bags 82 Left over 0.23 ft³ Weight 4,920 lb Cost $408.36 Reference price $4.98. Type your store's.
98 × 50 lb Bags 98 Left over 0.08 ft³ Weight 4,900 lb Cost $439.04 Reference price $4.48. Type your store's.
123 × 40 lb Bags 123 Left over 0.23 ft³ Weight 4,920 lb Cost $489.54 Reference price $3.98. Type your store's.

Shopping list

1.5 yd³ $370.00
74 50 lb bags (0.5 ft³) $405.52 Reference price $5.48. Type your store's.
2.25 short tons (2,000 lb) $196.25 Reference price $45.00. Type your store's. Reference price $95.00. Type your store's.
8 sheets, lapped 8 in $86.96 Reference price $10.87. Type your store's.
8 #4 bars, 20 ft $119.84 Reference price $14.98. Type your store's.
Ticked items $370.00

Untick what you already have.

Save imageExcel

Bags or a ready-mix truck

Bags $352.16
Truck $370.00 order 1.5 yd³ · billed 2 yd³

Bags are $17.84 cheaper.

From 1.5 yd³ up, the truck costs less than bags.

Includes the short-load fee small orders pay.

Reference price $150.00. Type your store's. Reference price $35.00. Type your store's. No reference price. Type what your store charges.

Every supplier rounds, sets a minimum and charges for small loads its own way. Ask before you order.

How this was worked out

Every number below is yours. Each constant links to the row where you can change it.

Slab 1 10' × 10' × 4" 33.333 ft³
All parts 33.333 ft³ ÷ 27 1.235 yd³ · 0.944 m³
Plus waste 33.333 ft³ × (1 + 10%) 36.667 ft³ = 1.358 yd³
Bags 36.667 ft³ ÷ 80 lb at 0.6 ft³ 62 × 80 lb · 0.53 ft³ left over

Change:Yield, 80 lb bag

Ready-mix 1.358 yd³ → quarter-yard 1.5 yd³

Change:Least a supplier bills

Base gravel (100 ft² × 4" + 0 ft³ in holes) × (1 + 10%) ÷ 0.5 ft³ a bag 74

Change:Base gravel depthYield, 50 lb gravel bag

Base gravel, delivered loose 1.358 yd³ × 1.59 short tons a yard, compacted, to 0.25 short ton steps 2.25 short tons (2,000 lb)

Change:Crusher run, compacted

Wire mesh 3' 6" × 7' sheets lapped 8", laid over each slab 8

Change:Mesh sheet widthMesh sheet lengthMesh lap

Rebar #4 every 1' 6" both ways, 3" in from the edge, 20' bars lapped 1' 8" 8

Change:Rebar spacingRebar kept in from the edgeRebar length soldRebar lap

Cost 2 yd³ × $150.00 + 2 yd³ × $35.00 $370.00

Assumptions

Every one of these is editable. Change one and the answer changes with it.

Assumption Value Confidence
Thinnest pour for concrete mixSakrete High-Strength Concrete Mix (Oldcastle APG): pour at least 2 in thick. Thinner is a job for a resurfacer. in From a data sheet or an agency document
Thinnest floor slabIRC 2021 R506.1: a concrete floor slab on the ground is at least 3½ in thick. ACI 332-20 §13.5 says the same, as the Tennessee Concrete Association summarises it. in From a data sheet or an agency document
Mesh sheet widthThe sheet Home Depot sells as a 42 in. x 84 in. remesh sheet. in From a data sheet or an agency document
Mesh sheet lengthThe sheet Home Depot sells as a 42 in. x 84 in. remesh sheet. in From a data sheet or an agency document
Mesh lapOne mesh square plus 2 in at every joint: 8 in for 6×6 mesh of W1.4-W2.1 wire under ACI 318-19 §25.5.4.1 (Wire Reinforcement Institute, WWR.7 schedule). WRI's ACI 301 detail for a slab on ground that carries no design load laps 2 in (WWR.2); the longer lap is kept. ≈ in Trade convention
Rebar spacingA common grid for #4 bar in a house slab. No standard sets one for a patio. ~ in Derived or single-supplier
Rebar kept in from the edgeACI 318-19 Table 20.5.1.3.1: 3 in of cover where concrete is cast against and stays in contact with the ground, kept here at the slab's edges. ~ in Derived or single-supplier
Rebar length sold#4 bar is sold in 10 ft and 20 ft lengths; the longer one wastes less. ~ ft Derived or single-supplier
Rebar lap40 bar diameters for #4 (½ in): a rule of thumb for a lap, not a code figure. ~ in Derived or single-supplier
Yield, 90 lb bagExtrapolated at 0.0075 ft³ per lb from the 80 lb bag of the 1101 data sheet, which lists no 90 lb bag. ~ ft³/bag Derived or single-supplier
Yield, 80 lb bagQuikrete Concrete Mix 1101 data sheet. ft³/bag From a data sheet or an agency document
Yield, 60 lb bagQuikrete Concrete Mix 1101 data sheet. ft³/bag From a data sheet or an agency document
Yield, 50 lb bagQuikrete Concrete Mix 1101 data sheet. ft³/bag From a data sheet or an agency document
Yield, 40 lb bagQuikrete Concrete Mix 1101 data sheet. ft³/bag From a data sheet or an agency document
Least a supplier billsJefferson County, MO ready-mix bid tabulation (2020): an order is billed at least 2 yd³. Every supplier sets its own minimum. ≈ yd³ Trade convention
Short-load fee underSame tabulation: a short-load fee on orders under 5 yd³. Ask your supplier for theirs. ≈ yd³ Trade convention
Price a truck fromCommon advice: past about a cubic yard, mixing bags by hand is a long day and a truck is worth pricing. ≈ yd³ Trade convention
Your truck's payloadFull-size (1500-series) pickups advertise 2,260-2,440 lb of payload (2026), and ordinary trims carry 600-700 lb less; this is the low end. Your truck's figure is on the driver's door-jamb placard. ~ lb Derived or single-supplier
Water per 80 lb bagQuikrete 1101 data sheet: start with about 6 pints per 80 lb bag, 6 to 9 pints in the end. Smaller bags take their share by weight. gal/bag From a data sheet or an agency document
Base gravel depthIRC R506.2.2 (R506.3.2 in IRC 2024) asks for 4 in of base under a floor slab below grade. Outdoors it is common practice. ≈ in Trade convention
Yield, 50 lb gravel bag0.5 ft³ per 50 lb bag. Sand, which the sand page buys in the same bag: Sakrete Play Sand (data sheet REV 3-10) and Sakrete's commercial sands (Rev. 06/16) yield 0.5 ft³, Quikrete Premium Play Sand is labeled 'approx 1/2 cu. ft.'; mason sand runs larger, 0.6 ft³ (Sakrete, Rev. 04/16). Gravel: Quikrete All-Purpose Gravel as retailers list it. ~ ft³/bag Derived or single-supplier
Crusher run, compactedMoDOT's compacted crushed granite or limestone, used for crusher run and paver base: assumed to pack about this tight, as no figure for the graded product was found. ~ short ton/yd³ Derived or single-supplier

How many yards of ready-mix to order

Work out the volume, add the waste, and round up to the step your supplier sells in. The slab this page opens with — 20 by 24 ft, 4 in thick — is 20 × 24 × 4/12 = 160 cubic feet, which is 160 ÷ 27 = 5.93 cubic yards. With the 10% waste in the box it is 6.52, so the order is 6.75 yards in quarter-yard steps. A supplier who sells in half yards would take an order for 7.0, and one who sells whole yards also 7 — the step select beside the truck's price changes it, and the page says how much a whole-yard step leaves over.

Round once, and round up. 6.52 yards ordered as 6.5 leaves you a wheelbarrow short at the far end of the pour, and a second truck for the last quarter yard costs a short-load fee on its own. Rounding 6.52 straight up to a whole 7 is not wrong either, as long as it is your supplier's step and not the calculator's habit — at a reference $150 a yard, a whole-yard step on a small order is real money.

Why order more than the math

The volume is the inside of the forms on a flat, level base. A real base is neither: an inch too deep across a 20 by 24 ft slab is another 1.48 yards, spread where nobody sees it. Some spills, some stays in the chute and the wheelbarrow, and forms bow a little under the load. The waste box starts at 10%, which sits inside the 5 to 10% most suppliers suggest, and it is applied once — the result shows the yards before and after it.

Yards for common slabs

Before waste:

Slab 4 in thick 5 in thick 6 in thick
10 × 10 ft1.231.541.85
12 × 12 ft1.782.222.67
12 × 16 ft2.372.963.56
16 × 20 ft3.954.945.93
20 × 20 ft4.946.177.41
20 × 24 ft5.937.418.89
24 × 24 ft7.118.8910.67

A yard of concrete covers 81 square feet at 4 in, 65 at 5 in and 54 at 6 in. For anything that is not one rectangle — an L-shaped patio, a slab with a footing round its edge, a run of post holes — add parts above and the order covers all of them.

Minimum orders and short loads

A truck costs more than its yards. Most suppliers bill a minimum, often 2 yards whatever you take, and add a short-load fee per yard to an order under a set size. This page starts from a published bid sheet's figures — a 2 yard minimum and a fee under 5 yards — and from $150 a yard, near the middle of the $125 to $165 range commonly quoted. All of them are boxes: type your supplier's own quote over them, and a delivery charge if they add one, and the order, the cost and the comparison with bags all move.

The opening slab is over 5 yards, so it carries no short-load fee: 6.75 yards at $150 is $1,012.50. Under the minimum, the comparison block says from how many yards the truck becomes cheaper than bags — below that, a pickup and a mixer win.

Common questions

How many yards of concrete do I need for a 20 by 24 slab?

5.93 cubic yards at 4 in thick, 6.52 with 10% waste, ordered as 6.75 in quarter-yard steps. At 6 in thick it is 8.89 before waste.

Should I round up to a whole yard?

Only if your supplier sells whole yards. Many sell in quarter or half yards, and rounding 1.23 up to 2 to be safe buys 0.77 yards you pay for and have to get rid of. Choose the step in the select and the page shows what it leaves over.

How much does a yard of ready-mix cost?

The page starts at $150, inside a commonly quoted $125 to $165, before the minimum, the short-load fee and delivery. It is a reference, not a quote: prices move by region and by the mix, so type in what your supplier says.

Is it cheaper to buy bags?

Under a yard or two, usually yes — the truck's minimum and fees weigh on a small order. Above that, bags lose on price and on labor: the opening slab is 294 bags of 80 lb, 23,520 lb to lift and mix. The comparison under the shopping list puts both on one line.

Is the waste added twice?

No. Waste is multiplied in exactly one place in this site, and the result shows the yards before and after it. Set the box to 0 and the two lines agree.