Find a tool

Concrete Column Calculator

Round columns — bags per form tube, and the tubes to buy.

Material only — it does not size a footing. Depth below frost is set by your building department.

Column 1

10" · 10 in · 0.8333 ft · 0.254 m

4' · 48 in · 4 ft · 1.2192 m

8.727 ft³

10% covers spill, a soft base and forms that bow. It is added once, to the concrete and the base gravel.

This page recalculates as you type. There is no Calculate button.

Answer

Save imageExcel

Bags

16 × 80 lb bags

0.356 yd³ with 10% waste · 0 ft³ left over · 1,280 lb · or 0.5 yd³ of ready-mix

Ready-mix, in quarter-yard steps 0.5 yd³ of ready-mix
Concrete 8.727 ft³
In cubic yards 0.323 yd³
In cubic meters 0.247 m³
With 10% waste 0.356 yd³
Weight of the bags 1,280 lb
Ticked items cost $150.80
DrawingThe project drawn to scale. Colum…: 10" × 4'.10"4'Colum…

Breakdown

Part Measurements Qty Volume Share
Column 1 10" × 4' Add ×4 8.727 ft³

What to buy

Ways to buy the bags

Every way is worked out; pick the one you will buy. The 50 and 90 lb bags are offered on their own only: we have not seen them on a shelf.

16 × 80 lb Bags 16 Left over 0 ft³ Weight 1,280 lb Cost $90.88
16 × 80 lb Bags 16 Left over 0 ft³ Weight 1,280 lb Cost $90.88
15 × 90 lb Bags 15 Left over 0.53 ft³ Weight 1,350 lb Cost $97.20 Reference price $6.48. Type your store's.
16 × 80 lb Bags 16 Left over 0 ft³ Weight 1,280 lb Cost $90.88 Reference price $5.68. Type your store's.
22 × 60 lb Bags 22 Left over 0.3 ft³ Weight 1,320 lb Cost $109.56 Reference price $4.98. Type your store's.
26 × 50 lb Bags 26 Left over 0.15 ft³ Weight 1,300 lb Cost $116.48 Reference price $4.48. Type your store's.
32 × 40 lb Bags 32 Left over 0 ft³ Weight 1,280 lb Cost $127.36 Reference price $3.98. Type your store's.

Shopping list

16 16 × 80 lb $90.88
12 gal free
4 4 × 10" across, cut to 4' $59.92 Reference price $14.98. Type your store's.
Ticked items $150.80

Untick what you already have.

Save imageExcel

Standards

We hold the criteria and the clause, not the wording of the standard.

Not checked IRC 2021 · R403.1.4.1

A footing, a wall or a post has to sit below the frost line, and that depth is set by your building department, not by the code book. Ask them before you dig.

How this was worked out

Every number below is yours. Each constant links to the row where you can change it.

Column 1 π/4 × (10")² × 4' × 4 8.727 ft³
All parts 8.727 ft³ ÷ 27 0.323 yd³ · 0.247 m³
Plus waste 8.727 ft³ × (1 + 10%) 9.599 ft³ = 0.356 yd³
Bags 9.599 ft³ ÷ 80 lb at 0.6 ft³ 16 × 80 lb · 0 ft³ left over

Change:Yield, 80 lb bag

Ready-mix 0.356 yd³ → quarter-yard 0.5 yd³

Change:Least a supplier bills

Water 1,280 lb of bags ÷ 80 lb × 0.75 gal 12 gal

Change:Water per 80 lb bag

Cost 16 × $5.68 + 4 × $14.98 $150.80

Assumptions

Every one of these is editable. Change one and the answer changes with it.

Assumption Value Confidence
Yield, 90 lb bagExtrapolated at 0.0075 ft³ per lb from the 80 lb bag of the 1101 data sheet, which lists no 90 lb bag. ~ ft³/bag Derived or single-supplier
Yield, 80 lb bagQuikrete Concrete Mix 1101 data sheet. ft³/bag From a data sheet or an agency document
Yield, 60 lb bagQuikrete Concrete Mix 1101 data sheet. ft³/bag From a data sheet or an agency document
Yield, 50 lb bagQuikrete Concrete Mix 1101 data sheet. ft³/bag From a data sheet or an agency document
Yield, 40 lb bagQuikrete Concrete Mix 1101 data sheet. ft³/bag From a data sheet or an agency document
Least a supplier billsJefferson County, MO ready-mix bid tabulation (2020): an order is billed at least 2 yd³. Every supplier sets its own minimum. ≈ yd³ Trade convention
Short-load fee underSame tabulation: a short-load fee on orders under 5 yd³. Ask your supplier for theirs. ≈ yd³ Trade convention
Price a truck fromCommon advice: past about a cubic yard, mixing bags by hand is a long day and a truck is worth pricing. ≈ yd³ Trade convention
Your truck's payloadFull-size (1500-series) pickups advertise 2,260-2,440 lb of payload (2026), and ordinary trims carry 600-700 lb less; this is the low end. Your truck's figure is on the driver's door-jamb placard. ~ lb Derived or single-supplier
Water per 80 lb bagQuikrete 1101 data sheet: start with about 6 pints per 80 lb bag, 6 to 9 pints in the end. Smaller bags take their share by weight. gal/bag From a data sheet or an agency document
Base gravel depthIRC R506.2.2 (R506.3.2 in IRC 2024) asks for 4 in of base under a floor slab below grade. Outdoors it is common practice. ≈ in Trade convention

How much concrete a form tube takes

A round column is π/4 times its diameter squared times its height. A 10 in form tube 4 ft tall is π/4 × (10/12)² × 4 = 2.18 cubic feet, which is 3.64 bags of 80 lb concrete mix before waste. The four this page opens with — the footings under a small deck or a porch post each — take 8.73 ft³, 9.60 with the 10% waste in the box, so 16 bags of 80 lb, 1,280 lb, and about 12 gallons of water to mix them. Buy for all the columns at once and round up once: four tubes rounded up one by one would buy 16 bags as well here, but at other sizes the difference is a bag a tube.

The diameter is typed in inches and the height in feet, the way tubes are sold and holes are dug. Change the quantity to the number of columns. The shopping list counts the tubes themselves too, one line per diameter and height, so the list you take to the store has them on it.

Concrete per foot of tube

Before waste, per foot of height:

Tube Cubic feet per foot 80 lb bags per foot 60 lb bags per foot
8"0.3490.580.78
10"0.5450.911.21
12"0.7851.311.75
14"1.0691.782.38
16"1.3962.333.10
18"1.7672.953.93
24"3.1425.246.98

Multiply by the height of each tube and the number of tubes, add the waste, and round up once. Doubling the diameter quadruples the concrete: a 24 in tube takes nine times what an 8 in one does.

How tall to type the tube

Type the concrete's height, from the bottom of the hole to the top of the tube: the part below ground and the few inches most tubes stand above it. The bottom of a deck or porch footing sits below the frost line, a depth set by your building department, and that is what the panel under the answer says it cannot check. A footing that sits above the frost line is lifted a little every winter, and no amount of concrete in the tube fixes it.

A wider base

Many column footings spread out at the bottom, with a flared plastic base or a square pad under the tube, to bear on more soil. This page does not draw the flared kind yet. A square pad can be counted as a second part: switch to the concrete footing calculator, which takes a column and a footing in the same project, and type the pad as a short footing — its length, its width and its thickness.

Common questions

How many bags of concrete for a 12 inch tube?

0.785 ft³ for every foot of height: 3.14 ft³ for a 4 ft tube, which is 5.24 bags of 80 lb or 6.98 of 60 lb before waste. Round the whole job up, not each tube.

How many bags for an 8 inch tube 4 ft deep?

1.40 ft³, which is 2.33 bags of 80 lb before waste — so 3 bags for one tube, and fewer per tube when you buy for several at once.

Is a form tube the same as a Sonotube?

Sonotube is a brand name for a cardboard concrete form tube. This page counts the concrete for any round form of the same size, whoever makes it, and we are not connected with Sonoco or any other maker.

Does this count the rebar in the column?

No. The steel in a column is sized with the column, by whoever designed it, and comes from a drawing. The concrete, the bags, the water and the tubes are here.

Is the waste added twice?

No. Waste is multiplied in exactly one place in this site, and the result shows the volume before and after it. Set the box to 0 and the two lines agree.